PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Connecting the copper piping to the 3rd floor VAV Boxes Facing East.jpg Copper piping at the 2nd floor Bathrooms Facing North.jpg Copper piping at the 4th floor Facing North.jpg Erecting stone panels at the North Elevation.jpg Installing Elev. 1,2,3 guide rails Facing West.jpg Installing motorized damper controllers at the 1st floor Facing South.jpg Copper piping at the 2nd floor Facing North.jpg Stone panel at the North Elevation.jpg
Previous pageNext page Installing Elev. 1,2,3 guide rails Facing West
Installing Elev. 1,2,3 guide rails Facing West